Paperless
Efficient QMS™
Created by: qualitycontrolplan.com

Home | Learn more about eQMS or call for information: 719-649-4242
Hold your smartphone in landscape mode for best view | Cookies required to operate eQMS
Disable Norton Safe Web extension in your Browser when using eQMS
Log In

Special Inspection Report

Revision: a
Date Report Issued: Report Revision:
Inspection Date: Report Number:
Arrival Time: Client/Owner Name:
Departure Time: Contract Number:  
Weather: Clear  Cloudy  Partly Cloudy  Outdoor Temperature:
Rainfall: Total Time Onsite:
Inspections Performed:
Name/ID# of Contract Inspector(s):
Contract Inspector Signature: Date:
Inspection and Test Data from Non-Accredited Sources:
Review of Material Certification Records:
Structure/Item Inspected:
Deviations:
Previous Inspection Discrepancy(s):
Results of Inspection(s):
Description of Samples:
Sampling Method:
Sample Details:
Sample Quantity:
Sample Dimensions:
Sample Characteristics:
Laboratory Traceability:
Inspection Equipment:
Remarks:
Statement of Conformity
We hereby certify special inspections were completed according to the Contract Number stated above and relate exclusively to the work ordered and structure/items inspected. Results of all chemical and physical tests are on file as well as related documented information, which are available for review by the Client according to the above Contract and related Specifications.
Authorized Approval Signature:   Date:
Inspector Name/ID Number: Training Renewal Date:
Inspector Mark/Seal: Inspector Mark/Seal Expiration:
Below is for Company Use Only
Completion of Desktop Review / Onsite Review
Desktop Review
Desktop Reviewer Name:
Desktop Reviewer Signature:   Date:
Onsite Review
Onsite Reviewer Name:
Onsite Reviewer Signature:   Date: